About the project

The existing Neuroscience roof was inverted or upside down. This means the waterproof membrane is applied directly to the roof deck with the insulation being loose laid on top with ballast holding it in place.

Liquid Roofing Ltd carried out the removal of the existing failed roof build up and installed a modern warm roof, finished with Sika Liquid Plastics Decothane membrane. All existing roof lights were replaced with efficient triple glazed units as part of the contract.

The roof is covered by a comprehensive guarantee covering labour and materials for 20 years.

Similar Projects

Related case study - Royal Preston Hospital

MRI Unit, Royal Preston Hospital

Project Value

£40,000 Approx

Related case study - Kellog's Building

Kellog’s Building

Project Value

£70,000 Approx